The purchase of this important historic site was made possible by a single gift from the Newburyport Five Cents Savings Bank.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
The expense involved with the restoration of this project was made possible through a grant from the Newburyport Community Preservation Committee which oversees the Newburyport Preservation Act adopted by the city of Newburyport in 2000.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Saturday, March 28, 2009

Structure

New 3rd floor joist and subfloor. New joist were milled to match existing ones. Providing a perfect fit into old mortices and brick pockets.
2nd floor Beam. 4 16" LVL's thoughbolted. It replaces old Steel beam that caused considerable damage to brickwork.